Line interfaces: Sample run
State the process that consumes the air, peak and average flow, minimum point-of-use working pressure, known piping losses, duty cycle, ambient for any dryer, oil carry-over class if a dryer is included, quantity and destination. Representative production samples here are demand logs or pressure charts, not a metal coupon. If the dryer is packaged, name where dew point will be measured at peak demand.
Site readiness
Confirm three-phase supply, connected load headroom, cooling-air intake or cooling-water flow and temperature, condensate drain routing, footprint and oil-separator pull space. Upstream interfaces include the intake filter environment; downstream interfaces include receiver volume and distribution take-offs. FAT at the factory and SAT with plant demand running stay with whoever the purchase order names.